• Wuhan Mingyang Technology Co., Ltd
    Global Power Solution Engineer
    Stable quality, on-time delivery, reliable long-term partner.
  • Wuhan Mingyang Technology Co., Ltd
    Gulf Electrical Engineering Se
    Professional technology and perfect after-sales service.
  • Wuhan Mingyang Technology Co., Ltd
    International Power Research L
    Customized solution meets our project requirements perfectly.
  • Wuhan Mingyang Technology Co., Ltd
    South America Electric Power P
    Professional team, good communication and stable supply.
Contact Person : Emma Zhang
Phone Number : +86 18627175510
WhatsApp : +8618627175510

6I‑6V Six‑Phase Secondary Injection Test Set Portable Relay Protection Tester

Place of Origin China Mainland
Brand Name MINGYANG
Model Number MY-S60
Minimum Order Quantity 1
Price 3400usd
Packaging Details carton
Delivery Time 1 week
Payment Terms L/C,D/A,D/P,T/T,Western Union
Supply Ability 1000pcs/month
Product Details
Measuring Range 0 Ω ~ 2000 Ω Testing Voltage 10 KV
Time Resolution 10 Ms Accuracy Class 0.5
Place Of Origin Hubei, China Current Resolution 100 MA
Operating Temperature 0 °C ~ 40 °C Current Range 0 - ± 10 A / Phase
Display Type LCD Display Speed Range 0.1 M/s
Dimensions 320mm*270mm*150mm Measurement Accuracy 1ms
Switching Input Terminal 8 Pairs Three-Phase Parallel Output 0-120A
Phase Voltage/Line Voltage Output Power 70va/90va
Highlight

High Accuracy Relay Protection Tester

,

6-Phase Output Secondary Current Injection Tester

,

400VA Output Power Microcomputer Relay Tester

Leave a Message
Product Description
6I‑6V Six‑Phase Secondary Injection Test Set Portable Relay Protection Tester
Product Description
6I‑6V Six‑Phase Secondary Injection Test Set Portable Relay Protection Tester is a new type of miniaturized microcomputer relay protection tester that fully utilizes modern advanced microelectronics technology and devices. It adopts an advanced structure that operates independently on a single machine and can also be connected to a laptop for operation. The host is equipped with a new generation high-speed digital signal processor microcomputer, a true 16 bit DAC module, a new modular high fidelity high-power amplifier, an industrial computer display, and a flexible and convenient rotating mouse controller, making it a handy tool for relay maintenance workers.
Product Alias
Six‑phase secondary injection test set / 6I‑6V relay protection tester / Six‑phase protective relay calibrator / Secondary injection relay test system / Transformer differential relay test set / Six‑channel relay test kit
Product Features and Functions
  • Current source: AC/DC voltage source, AC/DC current source
  • Parallel Output: Three-phase parallel output (effective value): 0-90A
  • Maximum Output Power Per Phase: 400 VA
  • Frequency Range: 0 ~ 1000 Hz with 0.01 Hz accuracy
  • Switch Input Terminal: 8 pairs
  • Harmonic Number: Comprehensive harmonic analysis capability
  • Phase Control: 0 ~360° with 0.1° accuracy
  • DC Current Output: 0 ~ ± 10 A / phase, accuracy: 0.2 % ± 5 mA
  • Dimensions: 410 mm * 190 mm * 420 mm
  • Time Range: 1ms - 9999s
  • Measurement Accuracy: 1ms
  • Packing Weight: 22.5 kg
Technical Specifications
Parameter Specification
Output Voltages 110V (1A) - 220V (0.6A)
Power Supply AC220V±10%
Current Source AC/DC voltage source, AC/DC current source
Power Supply Frequency AC220V±10% 50Hz
Maximum Output Power Per Phase 420VA
DC Current Output 0- ± 10A/phase, accuracy: 0.5% ± 5mA
Line Voltage Output (Effective Value) 0-240V
Three-Phase Parallel Output 0-90A
Switching Input Terminal 8 pairs
Time Range 1ms - 9999s
Measurement Accuracy 1ms
Application Scenarios
6I‑6V Six‑Phase Secondary Injection Test Set Portable Relay Protection Tester
FAQ
Question 1: Device prompts wiring fault alarm when starting test
Customer: When we start relay test at substation site, the main unit pops up wiring fault alarm and cannot execute test procedure, all test cables look connected correctly. What should we do?
Manufacturer: This is a common on‑site fault. Please perform troubleshooting step‑by‑step. First, power off the instrument, check whether current and voltage test cables are fully inserted into corresponding terminals. Second, inspect digital input and output wiring for loose contact or short‑circuit. Third, check insulation damage and metal probe condition of test leads. Restart the device after re‑connecting all cables. If alarm still exists, restore factory settings and reboot. Do not carry out tests under faulty wiring status. If the problem remains unsolved, contact our technical support and do not disassemble the main unit yourself.
Question 2: Large deviation between measured value and relay setting value
Customer: We complete relay protection test, but the measured action value deviates obviously from relay setting value without any error prompt. How to fix this issue?
Manufacturer: Inaccurate test results are mainly caused by poor contact, wrong parameter configuration or calibration loss. Firstly, check all test alligator clips for oxidation and bad contact, clean contact points if needed. Secondly, double‑check test parameters including output amplitude, step size and test mode according to relay specification manual. Thirdly, run the built‑in self‑calibration program of the tester. Avoid long thin signal wires during field test. If deviation is still large after above operations, send us your test record for further technical guidance.
Question 3: Fan Fails to Start; Device Overheating Protection Activated
Customer: During long‑time heavy‑load relay test, the cooling fan stops suddenly. After power‑off and restart, overheating protection keeps triggering. Is the hardware damaged?
Manufacturer: This is mostly protection lock instead of permanent hardware damage. Continuous heavy‑duty operation or blocked ventilation grille will trigger thermal protection. Please cut off AC power completely, clear dust of ventilation openings, and let the instrument cool down for about 30 minutes. After full cooling, power on and press Reset button on panel to release protection lock. Never cover ventilation holes during field operation. If overheating protection still triggers after cooling and reset, please contact us promptly and do not attempt to disassemble the equipment yourself.
Question 4: The main unit experiences frequent resets and tripping
Customer: In substation field environment, the SX‑6600 main unit resets automatically occasionally and interrupts ongoing relay test. How can we avoid this situation?
Manufacturer: Frequent reset is mainly caused by unstable power supply, strong electromagnetic interference or unreliable grounding. It is recommended to adopt independent power supply with sufficient capacity, do not share power circuit with large‑power site equipment. Reliable grounding for main unit is required, grounding point shall be buried in moist soil. Place the tester far away from high‑voltage equipment and strong interference sources. Check input voltage whether it meets device requirements. If reset still occurs, provide us with on‑site condition description, we will arrange remote technical support.
Question 5: Precautions for Transportation, Handling, and Wiring
Customer: This six‑phase relay protection tester is portable suitcase type but contains precise electronic modules. What key points should we notice for transportation, carrying and on‑site wiring operation?
Manufacturer: Yes, please follow these important precautions. First, this tester outputs analog high‑current and high‑voltage signals during testing; operators must strictly comply with local high‑voltage test safety regulations. Second, avoid heavy impact and drop during transportation, anti‑collision protective corners cannot be removed. Third, double‑check wiring before test, wrong connection will cause permanent damage to output channels; double‑person check for wiring is recommended. Fourth, keep device surface dry, prohibit operation under humid, dusty or rainy environment. Fifth, store the tester in dry and ventilated place when idle. First‑time users shall fully read operation manual and operate under guidance of experienced test personnel.
Question 6: Shipping Method
Customer: If we place an order, how do you typically ship the goods? Will there be any issues with transporting bulky items such as reactors?
Manufacturer: We default to using dedicated logistics lines or brand-specific express shipping services; small-sized main units and accessories may also be shipped via standard courier services. Large items, such as reactors and excitation transformers, are packed using wooden crates or wooden frames for reinforcement to prevent bumps and moisture exposure during transit; a packing list is included with each package to facilitate item-by-item counting for you. Logistics costs are typically determined by both parties in accordance with the contract terms; after shipment, we will send you both the tracking number and the carrier's contact phone number for easy tracking.If your project site is remote or if delivery to the site is required with a specified logistics company, please inform us in advance when placing your order; we can then coordinate and arrange accordingly.
Question 7: Delivery Lead Time
Customer: Our project is under tight deadlines; how long will it take for the order to be shipped after we place it? Can we request expedited shipping?
Manufacturer: Standard specifications – stock available; typically delivered upon receipt of the order. Orders can be shipped within [X] working days; for non-standard products requiring customized voltage levels, capacities, or reactor combination configurations, the production cycle typically ranges from [X] to [Y] days.The delivery time will be approximately 7-15 working days; the specific timeline shall be subject to the sales confirmation provided upon order placement. If your project has a tight schedule, please inform us of the latest expected delivery date before placing your order; we will first verify the production schedule and inventory status, and where possible, will coordinate expedited production and prioritize shipment. However, it is recommended to allocate sufficient transit time for logistics to avoid delaying on-site testing.
Question 8: After-sales Service and Warranty
Customer: What is the warranty period for this equipment? If any issues arise during on-site use, how will your after-sales service respond?
Manufacturer: We provide a two-year free warranty on the entire unit and lifelong technical support services. During the warranty period, if issues arise due to defects in the equipment itself, we will provide free repair or replacement of components; when problems occur on-site, we commit to responding within 24 hours; most wiring and parameter configuration issues can be resolved through remote guidance via video or telephone; for cases where an on-site visit is necessary, we will arrange for our technicians to arrive at the location to resolve the issue. After the warranty period expires, we still offer repair services, with spare parts supplied at cost price for the long term, and software updates provided free of charge for life. Upon delivery of the equipment, we also offer free operational training (video operation guides)to ensure that your testing personnel can operate the equipment independently and proficiently; should you have any further questions, please feel free to contact our dedicated after-sales hotline directly.
Question 9: Shipping methods for each region (Sea freight)
Customer: Our projects are distributed across several states, and our procurement volumes are substantial; are the shipping methods consistent across all states? How is the delivery time calculated?
Manufacturer: The specifications are identical; however, it should be specifically noted that this equipment set is large in size and heavy in weight—components such as the reactor and excitation transformer are all classified as heavy components. Therefore, regardless of which state or region the shipment is destined for, we will uniformly utilize sea freight transportation. The packaging employs export-grade wooden crates with reinforced structures, along with moisture-proof and rust-proof treatments; the design of these wooden crates is optimized for long-distance sea transport and multiple lifting and transshipment operations. Upon arrival at the destination, simply unpack the goods and conduct an inspection before putting them into use. Regarding delivery time, the sea freight transit period depends on the port of destination: near-sea routes are generally faster, whereas ocean routes may take longer; the exact number of days will be confirmed based on the shipping schedule specified in the bill of lading. We have a dedicated freight forwarding agency to handle booking of shipping space, customs declaration, insurance, and other related procedures; once the vessel departs, we will send you documents such as the bill of lading and the packing list, enabling you to arrange for the receipt of goods at the port of destination and their inland transshipment in advance

Shipping scenario

Scene (One)

6I‑6V Six‑Phase Secondary Injection Test Set Portable Relay Protection Tester

Scene (Two)
6I‑6V Six‑Phase Secondary Injection Test Set Portable Relay Protection Tester

Attachment Directory

Qty Item Name
1 Six‑phase relay protection tester main unit (SX‑6600)
1 AC power cord
1 Wireless USB mouse
1 Large‑current test cable set
1 Voltage test cable set
1 DI/DO digital signal test cables
1 Auxiliary short‑circuit jump wires
1 Multi‑color alligator clip kit
1 Grounding cable
1 Spare fuse parts kit
1 English operation manual

Attachment Image
6I‑6V Six‑Phase Secondary Injection Test Set Portable Relay Protection Tester