• Wuhan Mingyang Technology Co., Ltd
    Global Power Solution Engineer
    Stable quality, on-time delivery, reliable long-term partner.
  • Wuhan Mingyang Technology Co., Ltd
    Gulf Electrical Engineering Se
    Professional technology and perfect after-sales service.
  • Wuhan Mingyang Technology Co., Ltd
    International Power Research L
    Customized solution meets our project requirements perfectly.
  • Wuhan Mingyang Technology Co., Ltd
    South America Electric Power P
    Professional team, good communication and stable supply.
Contact Person : Emma Zhang
Phone Number : +86 18627175510
WhatsApp : +8618627175510

MY-139 Large Grounding Grid Resistance Tester Digital Earth Grid Resistance Tester For Substation Ground Measurement

Place of Origin China Mainland
Brand Name MINGYANG
Model Number MY-139
Minimum Order Quantity 1
Price 2000USD
Packaging Details carton
Delivery Time 1 week
Payment Terms L/C,D/A,D/P,T/T
Supply Ability 100/Month
Product Details
Ground Impedance Range 0.030Ω‑2000Ω Soil Resistivity Range 0.000Ωm‑999KΩm
Basic Accuracy ±0.5%FS±5dgt Rated Measuring Power 2000W
Short‑circuit Current 1A,2A,3A,4A,5A No‑load Max Voltage AC 400V±10% Sine Wave
Test Frequency 45Hz, 55Hz, Automatic Dual‑frequency Optional Measurement Method Two‑wire / Three‑wire / Four‑wire Test
Electrode Spacing 1m‑100m Adjustable Display 7‑inch Touch Color Screen
Data Storage 100 Groups Print Function Built‑in Thermal Printer
Print Paper Size 57*40mm Power Supply AC 220V 10A(50Hz)
Dimension 540mm×440mm×210mm Instrument Weight 27kg
Total Accessory Weight 5.5kg Working Temperature -10℃~40℃
Storage Temperature -20℃~60℃
Highlight

MY-139 grounding grid resistance tester

,

digital earth grid resistance tester

,

substation ground measurement tester

Leave a Message
Product Description

MY-139 Large Grounding Grid Resistance Tester Digital Earth Grid Resistance Tester For Substation Ground Measurement


Product Description

The digital large-scale ground grid ground resistance tester, also known as the power frequency ground resistance tester, ground resistance meter, etc., is a common instrument for testing and measuring ground resistance. It adopts a new variable frequency AC power supply, dual-frequency measurement technology, super large touch color screen and microprocessor technology to meet the requirements of two-wire, three-wire and four-wire test impedance, and can measure soil resistivity, step voltage, distributed potential, contact voltage, current phase angle and other parameters. It is suitable for telecommunications, electricity, meteorology, computer rooms, oil fields, power distribution lines, tower transmission lines, gas stations, factory grounding grids, lightning rods, etc., and meets the standards of power substations and lightning protection device detection instruments. The instrument test is accurate, fast, simple, stable and reliable. The maximum open circuit voltage output of this tester can reach 400V, and the maximum short-circuit current can reach 5A. Microprocessor control and automatic dual-frequency technology can accurately measure and calculate the ground impedance value under 50Hz power frequency under strong interference, and the large screen display is clear at a glance. 100 sets of data can be stored at the same time, and the resistance measurement range is: 0.030Ω~2000Ω. The measured data can be printed out through a thermal printer. The digital large-scale ground grid ground resistance tester consists of a host, test wire, ground rod, etc., and has the functions of reading, reviewing, saving, and printing historical data.

Product Alias

Large earth grid resistance tester / Frequency conversion grounding grid impedance tester / Substation earthing grid resistance analyzer / Digital large‑scale grounding resistance measuring instrument / Power plant ground grid tester / Anti‑interference earth resistance tester for big grounding network

Features

1.Multi-Function Testing: The ES3030 supports ground resistance measurement, soil resistivity measurement, step voltage measurement, distributed potential measurement, touch voltage measurement, and impedance angle measurement, helping users complete multiple grounding-related tests with one instrument.
2.Wide Measurement Range: This model provides ground impedance measurement up to 2000Ω with 0.001Ω minimum resolution, and supports soil resistivity measurement up to 999kΩm, making it suitable for large grounding network evaluation and field testing tasks.
3.High Power Output: With rated measuring power of 2000W, maximum open-circuit voltage of AC 400V±10%, and short-circuit current settings from 1A to 5A, the ES3030 is designed for demanding grounding tests under practical site conditions.
4.User-Friendly Interface: The instrument uses a 7-inch touch color screen, supports measurement progress prompts, historical data review, storage for 100 groups, and built-in thermal printing for convenient on-site operation and result management.
5.Flexible Test Methods: The ES3030 supports two-wire, three-wire, and four-wire testing, with selectable 45Hz, 55Hz, and optional automatic dual-frequency modes, offering flexibility for different grounding measurement scenarios.

Product Parameters

achievement able
Ground impedance measurement, soil resistivity measurement, step voltage measurement, distributed potential measurement, contact
voltage measurement
Ground impedance
0.030~1.999Ω
Accuracy: ±0.5%FS±5dgt
Resolution: 0.001Ω
2.00~19.99Ω
Resolution: 0.01Ω
20.0~199.9Ω
Resolution: 0.1Ω
200~2000Ω
Resolution: 1Ω
Soil resistivity
0.000~9.999Ωm
ρ=2πaR X (Note 3)
Resolution: 0.001Ωm
10.00~99.99Ωm
Resolution: 0.01Ωm
100.0~999.9Ωm
Resolution: 0.1Ωm
1000~9999Ωm
Resolution: 1Ωm
10.0~99.9KΩm
Resolution: 0.1KΩm
100~999KΩm
Resolution: 1KΩm
Step voltage, distributed potential, contact voltage
0.0 0 0~ 1.999KV
U=Z*Is (Note 4)
Resolution: 0.001KV
2.00~19.99KV
Resolution: 0.01KV
20.0~199.9KV
Resolution: 0.1KV
200~20000KV
Resolution: 1KV
Impedance angle measurement
0~359.9°

Resolution: 0.1°
radian
0~6.283

Resolution: 0.001
Rated measuring power
2000W
Anti-interference ability
Anti-power frequency 50Hz voltage 50V
Baseline conditions
23 ºC± 5 ºC, 70%rh or less ( auxiliary grounding resistance 20Ω ± 10% , voltage to ground < 10V)
electricity source
AC 220V 10A (50Hz)
back Light
Adjustable backlight brightness
Measurement method
Four-wire test, three-wire test, two-wire test
Measurement method
Ground impedance: rated current method,
Short circuit current output
1A , 2A , 3A , 4A , 5A (5 settings )
Soil resistivity electrode spacing range
Can be set from 1m to 100m
Test frequency
45Hz , 55Hz , automatic dual frequency optional
Short circuit maximum current
AC 5A ± 10% sine wave
No-load maximum voltage
AC 400V ± 10% sine wave
Display Mode
7- inch touch color screen
touch screen
yes
Measurement Indication
Measurement progress display, measurement prompt animation display
Instrument size
Length, width and height: 540mm × 440mm × 210mm
Standard test line length
Red 15m , Black 15m , Yellow 10m , Green 10m , Yellow 1.5m , Green 1.5m , 1 each
Auxiliary ground rod
800mm 2 pieces 200mm 2 pieces
Measuring time
Ground impedance: about 1 minute / time
Print
Built-in thermal printer
Printing paper specifications
57*40mm
Data storage
100 groups, "Save successfully ! " storage indication, display "Save failed , space is full ! " characters indicate that the
storage is full
Data review
have
Overflow Display
Over-range overflow function: " OL " symbol displayed
Automatic shutdown
none
achievement Consumption
Standby : <110W
Measured: 2000W
quality quantity
Instrument: 27 kg
Test lead, auxiliary ground rod, instrument bag: 5.5kg
Working temperature and humidity
-10 ºC~ 40 ºC; 80%rh or less
Storage temperature and humidity
-20 ºC~ 60 ºC; 70%rh or less
Insulation resistance
10MΩ or more ( 500V between circuit and housing )
Resistance Pressure
AC 3700V/rms ( between circuit and housing )
Electromagnetic properties
IEC61010-4-3 , radio frequency electromagnetic field ≤ 1V/m
Suitable for safety regulations
IEC61010-1 , IEC1010-2-31 , IEC61557-1,5 , IEC60529 (IP54) , pollution level 2 , CAT III 300V

Application Scenarios

MY-139 Large Grounding Grid Resistance Tester Digital Earth Grid Resistance Tester For Substation Ground Measurement

FAQ

Question 1: Unable to get stable measurement readings
Customer: When testing the substation grounding grid, the measured value keeps fluctuating and cannot get stable data. What is the reason?
Manufacturer: This is mainly caused by strong on‑site power frequency interference. Please check whether the instrument and test electrodes are reliably grounded. Keep the current and potential test lines separated and avoid parallel laying. Re‑check whether C1, P1, P2, C2 terminals are tightly connected. Restart the device and select anti‑interference test mode. If readings are still unstable, adjust test frequency. Do not open the cabinet by yourself, contact us for support if the problem persists.
Question 2: Measurement result deviates greatly from expected value
Customer: The instrument runs normally, but the final grounding resistance test result has obvious deviation compared with historical data. How to troubleshoot?
Manufacturer: Confirm test electrode layout strictly follows technical requirements, unreasonable electrode position will cause big error. Check for broken or aging test cables. Make sure electrode rods are driven deep enough into moist soil. Complete instrument warm‑up before formal measurement. Stay away from high‑voltage equipment and large‑current cables during testing. If deviation remains, re‑arrange electrodes and perform repeated tests.
Question 3: Built‑in printer fails to print or prints blank paper
Customer: After finishing the grounding grid test, I trigger print function, but no content comes out or the printer does not respond.
Manufacturer: Check whether thermal printing paper is installed correctly (pay attention to paper surface direction). Confirm printing paper is not exhausted. Power‑cycle the instrument. Do not pull paper forcibly to avoid damaging print head. Replace with new standard thermal paper roll. If still no output, stop operation and contact technical support.
Question 4: Device triggers over‑current / over‑voltage alarm and stops testing
Customer: During field measurement, the tester pops up alarm and automatically interrupts the test progress.
Manufacturer: Over‑current or over‑voltage protection is activated. Immediately stop the test. Inspect C1‑C2 and P1‑P2 test loops for short‑circuit, poor contact or wire damage. Remove external fault sources. Reboot the instrument and restart measurement. Repeated alarms indicate internal abnormality; discontinue use and contact our technical team.
Question 5: Touch screen freezes, program crash or test data lost
Customer: The touch screen sometimes freezes on‑site; saved test records disappear accidentally.
Manufacturer: Never cut off power supply during data reading or saving. Reboot equipment when screen is stuck. Back‑up important test data timely. Use stable mains power and avoid severe grid voltage fluctuation. Operate in dry environment, prevent dust and moisture from entering panel. If fault occurs frequently, please send detailed fault description for further guidance.
Question 6: Operation, wiring and transportation precautions
Customer: What safety points we need to follow for field test, wiring and equipment transport?
Manufacturer: Reliable grounding is mandatory before operation. Operated by professional electrical technicians only. Strictly distinguish C1/P1/P2/C2 terminals, wrong wiring will damage the tester. Avoid heavy impact and drop during transportation. Do not disconnect test cables while running. Keep unit dry, avoid rain and damp environment. Read full user manual before on‑site work.
Question 7: Shipping Method
Customer: If we place an order, how do you typically ship the goods? Will there be any issues with transporting bulky items such as reactors?
Manufacturer: We default to using dedicated logistics lines or brand-specific express shipping services; small-sized main units and accessories may also be shipped via standard courier services. Large items, such as reactors and excitation transformers, are packed using wooden crates or wooden frames for reinforcement to prevent bumps and moisture exposure during transit; a packing list is included with each package to facilitate item-by-item counting for you. Logistics costs are typically determined by both parties in accordance with the contract terms; after shipment, we will send you both the tracking number and the carrier's contact phone number for easy tracking.If your project site is remote or if delivery to the site is required with a specified logistics company, please inform us in advance when placing your order; we can then coordinate and arrange accordingly.
Question 8: Delivery Lead Time
Customer: Our project is under tight deadlines; how long will it take for the order to be shipped after we place it? Can we request expedited shipping?
Manufacturer: Standard specifications – stock available; typically delivered upon receipt of the order. Orders can be shipped within [X] working days; for non-standard products requiring customized voltage levels, capacities, or reactor combination configurations, the production cycle typically ranges from [X] to [Y] days.The delivery time will be approximately 7-15 working days; the specific timeline shall be subject to the sales confirmation provided upon order placement. If your project has a tight schedule, please inform us of the latest expected delivery date before placing your order; we will first verify the production schedule and inventory status, and where possible, will coordinate expedited production and prioritize shipment. However, it is recommended to allocate sufficient transit time for logistics to avoid delaying on-site testing.
Question 9: After-sales Service and Warranty
Customer: What is the warranty period for this equipment? If any issues arise during on-site use, how will your after-sales service respond?
Manufacturer: We provide a two-year free warranty on the entire unit and lifelong technical support services. During the warranty period, if issues arise due to defects in the equipment itself, we will provide free repair or replacement of components; when problems occur on-site, we commit to responding within 24 hours; most wiring and parameter configuration issues can be resolved through remote guidance via video or telephone; for cases where an on-site visit is necessary, we will arrange for our technicians to arrive at the location to resolve the issue. After the warranty period expires, we still offer repair services, with spare parts supplied at cost price for the long term, and software updates provided free of charge for life. Upon delivery of the equipment, we also offer free operational training (video operation guides)to ensure that your testing personnel can operate the equipment independently and proficiently; should you have any further questions, please feel free to contact our dedicated after-sales hotline directly.
Question 10: Shipping methods for each region (Sea freight)
Customer: Our projects are distributed across several states, and our procurement volumes are substantial; are the shipping methods consistent across all states? How is the delivery time calculated?
Manufacturer: The specifications are identical; however, it should be specifically noted that this equipment set is large in size and heavy in weight—components such as the reactor and excitation transformer are all classified as heavy components. Therefore, regardless of which state or region the shipment is destined for, we will uniformly utilize sea freight transportation. The packaging employs export-grade wooden crates with reinforced structures, along with moisture-proof and rust-proof treatments; the design of these wooden crates is optimized for long-distance sea transport and multiple lifting and transshipment operations. Upon arrival at the destination, simply unpack the goods and conduct an inspection before putting them into use. Regarding delivery time, the sea freight transit period depends on the port of destination: near-sea routes are generally faster, whereas ocean routes may take longer; the exact number of days will be confirmed based on the shipping schedule specified in the bill of lading. We have a dedicated freight forwarding agency to handle booking of shipping space, customs declaration, insurance, and other related procedures; once the vessel departs, we will send you documents such as the bill of lading and the packing list, enabling you to arrange for the receipt of goods at the port of destination and their inland transshipment in advance

Shipping scenario

Scene (One)

MY-139 Large Grounding Grid Resistance Tester Digital Earth Grid Resistance Tester For Substation Ground Measurement

Scene (Two)

MY-139 Large Grounding Grid Resistance Tester Digital Earth Grid Resistance Tester For Substation Ground Measurement

Attachment Directory

Meter

1 set

Instrument bag

1

Auxiliary ground rod

4 sticks

Test line

4 strips (15m for red, 15m for black, 10m for yellow, 10m for green)

Simple test lead

2 (yellow 1.5m, green 1.5m each)

220V power cord

1

Manual, Warranty

1 set

Attachment Image

MY-139 Large Grounding Grid Resistance Tester Digital Earth Grid Resistance Tester For Substation Ground Measurement